Heath Construction Update: McDonald Road Phase 2 Roadway Project

Heath Construction Update: McDonald Road Phase 2 Roadway Project

HEATH, TX (September 18, 2020) PROJECT SCOPE: The McDonald Road Phase 2 Roadway Project is the re-construction of McDonald Road from an approximate 22-foot asphalt road to a 24-foot concrete roadway. The project is from the end of the concrete section of McDonald Road, southeast, to the southeast corner of the Falcon Point Subdivision. Work […]

Senior Spotlight: Meg McDonald, Rockwall-Heath High School

Senior Spotlight: Meg McDonald, Rockwall-Heath High School

(ROCKWALL/HEATH, TX – March 24, 2020) Meg McDonald is three year Varsity softball player who leads her team with the positive attitude that anything is possible. She’s an all around player of many positions, currently Center Field at Rockwall-Heath High School, along with three other seniors – Tristian Court, Shelby Curtis and Abby Lowry. During her […]